1. Use construction hand drill remove old surface, then clean up the surface.
2. Apply Bonddex ARC-76 first then leveling Bonddex R-1.
Initial Set: 12 mins.
Open to Traffic: 1 hr.
1. Use construction hand drill remove old surface, then clean up the surface.
2. Apply Bonddex ARC-76 first then leveling Bonddex R-1.
Initial Set: 12 mins.
Open to Traffic: 1 hr.