Light Rail Transit Fast Repairing
Light Rail Transit Fast Repairing
Light Rail Transit Fast Repairing
Light Rail Transit Fast Repairing
Light Rail Transit Fast Repairing
Light Rail Transit Fast Repairing
Light Rail Transit Fast Repairing
Light Rail Transit Fast Repairing
Light Rail Transit Fast Repairing
Light Rail Transit Fast Repairing
  • Date
    Mar. 2021

1. Use construction hand drill remove old surface, then clean up the surface. 

2. Apply Bonddex ARC-76 first then leveling Bonddex R-1. 

Initial Set: 12 mins.

Open to Traffic: 1 hr.

Category Paths

  1. 01
    1. Projects by Product/
    2. R-1 Ultra Early Strength Cement