Original Ground Issues: The original concrete structures submerged in seawater for a prolonged period have suffered gradual damage due to seawater erosion, with some severe areas even exposing internal reinforcement bars.
S-3 features high density and non-shrink properties, effectively reducing material cracking issues. It also possesses excellent resistance to seawater, making it an ideal choice for the Kaohsiung Port shipyard refurbishment project.