Category Paths

  1. 01
    1. Projects by Product/
    2. R1-1 Ultra Early Strength Mortar
Car Factory
Car Factory
Car Factory
Car Factory
Car Factory
Car Factory

Preparation: The depth of drilling holes is from 2mm to 50mm. We repair the slap with R1-1 first.

After repairing, then we level R1-1 with 50% aggregates. The thickness is 20mm.  


Constructor: Yishun Resin Engineering Limited Company