Car Factory
  • Date
    Jul., 2020
  • Contractor
    Dounan, Taiwan
  • Contractor
    Lee Ming Construction Co., Ltd
  • Sector
    Factory
  • Product
    Bonddex R1-1

Preparation: The depth of drilling holes is from 2mm to 50mm. We repair the slap with R1-1 first.

After repairing, then we level R1-1 with 50% aggregates. The thickness is 20mm.  


Constructor: Yishun Resin Engineering Limited Company