Light Rail Transit Fast Repairing

1. Use construction hand drill remove old surface, then clean up the surface. 

2. Apply Bonddex ARC-76 first then leveling Bonddex R-1. 

Initial Set: 12 mins.

Open to Traffic: 1 hr.